Automatic aluminum formwork production line


Production capacity calculation for automatic aluminum formwork production line (For reference only.)

Working time: one shift per day; 10 hours per shift; calculate with efficiency 95%.


A piece of 400 mm × 2700mm formwork production data is as below:

1) Weld seam parameters: 8pcs reinforcement ribs of aluminum formwork ≈ 3400mm ( Data shall be subject to processing drawings.)
2) Welding time: 330 seconds (two robots welding simultaneously)
3) Moving time of welding robot from station A to station B: 15 seconds
4) Therefore,time to produce 1pc of 400mm×2700mm long board is: 330 seconds+15 seconds=345 seconds
5) Aluminum formwork standard panel production capacity:
1 piece of 400 × 2700 aluminum formwork standard panel=1.08 sqm,
welding time of dual robot welding workstation is 345 seconds/piece ÷ 4 sets of welding workstations ≈ 86 seconds/aluminum formwork.

Working time is 10 hours per shift, and automatic line efficiency is calculated as 95%, each shift produces approximately 400 pieces of 400 × 2700 standard panel.


Note: Customization is available for production line based on customer's requirement.